Runway Resurfacing Project Underway at Grissom

Grissom's 12,501-foot runway is currently being resurfaced to a depth of five inches, but parts of the runway are being completely excavated and the full depth of the substructure materials will be replaced. (Courtesy photo)

PHOTO BY: Master Sgt. Josh Weaver
VIRIN: 230713-F-XX000-001.JPG
FULL SIZE: 3.73 MB
Additional Details

CAMERA

ONEPLUS A6013

LENS

N/A

APERTURE

170/100

SHUTTERSPEED

1/1591

ISO

100

IMAGE IS PUBLIC DOMAIN

Read More

This photograph is considered public domain and has been cleared for release. If you would like to republish please give the photographer appropriate credit. Further, any commercial or non-commercial use of this photograph or any other DoD image must be made in compliance with guidance found at https://www.dimoc.mil/resources/limitations, which pertains to intellectual property restrictions (e.g., copyright and trademark, including the use of official emblems, insignia, names and slogans), warnings regarding use of images of identifiable personnel, appearance of endorsement, and related matters.